Housing: Setting Keller Steel

One of the first steps in building a new house is
Setting the steel beams and columns in the basement and / or scanning
Room. This supports the ceiling joists and usually runs the length of
the house in the middle of the range in most homes. Not only has this system
Support of the bunk, but usually has the weight of the load-bearing walls
Ceilings on the second floor, second floor bearing walls and sometimes
Roofs transmitted down earlier.

The first step is to install the thresholdPlates based
Wall. This gives you a place to nail 2x4 reinforcements to contain the columns and beams in place while you install does. Once there, the steel brackets supporting the ceiling beams are set to take their place nailed.

Before continuing, a word of warning. construction can be a
dangerous activities. Care and safety are a must in all phases of
the construction process. Setting Steel finally returned to
category. Managers can weigh between 100to £ 400
depending on the size and length. The carriers may be placed on
Place manually, but I would recommend the use of a crane. Not only
be the bearers of the city is guaranteed, but can also quicken
Trial.

Door sills instead of steel can be set. One end of
the first ray usually begins in a beam formed in the bag
top of the foundation wall. The other end sits on a Lally
Column. A typical column 31 / 2 "in diameter and filled with
concrete. Must be welded a flange at the top with holes in it,
Game holes in the bottom flange of the beam. The beam is reduced
be the column and then bolted together.

To be successful, I would take four people. One to hold the
Beam into the pocket to keep the column, a man on a ladder
nailed to studs and guide the beam on the column and a man
Off bracing for sillPlates. Braces (2x4) are flat on
bottom flange of the beam on both sides of the track and then
Scuff plates nailed on opposite walls.

The beam next set. With a person
next column, the beam is the next new column and reduced the
previous column. Men on the stairs leading to their place and the block
down. 2x4 again be used to tighten the beam to the outside
foundations down. ThisProcedure is repeated until a GET --
Beam pocket at the other end of the building, or a column that
ends in an opening.

Beams to maintain the level and straight, I want to be a line to dry using
Pocket Bag beam bundle (this can also be done with a laser).
Before I had a nail in the sill with the corresponding
Edge of the beam. Most bars run pockets. If this is the
Case, I'll drive a nail in the minutes of thatPocket on the same
Size as the first nail, as measured by a common reference point
Point, usually the threshold of the front or rear. Now I have one
Competing with the edge of the reference beam and results
in a facility straight.

Provided that the foundation and sill finishes are simple, this string
can be used to level the steel bar (again, the laser can
used). After most of the plants is a ray 2x plate screwed or
or killed with a powder-actuatedTool for the upper beam. This
is to bring them to the level of performance and door thresholds, nailing
for beams of the ceiling. A block of 2x as a yardstick, then lay it on
Top of the bar, where he sits on a column. This simulates
Plate which will later be installed. Shim the column until the
Block the bottom line dry. Repeat this process for each
Column. Columns with steel plates of different shimmed
Thicknesses. These spacers are made available bysuppliers of steel.

The next step is the Lally columns on the batch of cement
Pads. With a level of 4 feet, the columns are used in Lot
with a hammer. Make sure that the spacers remain in the steel
BLOB columns. After all the columns to be explored, the groups, the concrete floor can
be expressed. This must be done in the columns.

The next step is to make the bottom frame. Once the beams are
Nailed can be removed, rather than all auctions. The beams are now
Operation of the steel in place.

That is how the Foundation, setting the right steel and the level
important to have a good home.

(c) Mike Merisko www.sawkerfs.com